Advanced Steel Designs
Part: C

0

0

IE code
CO1-265-C-I
Language
English
Format
PDF
Nr. Of Pages
1
Type of publication
Case Study

Instructor support

A Teaching Note is available for this material.

Description

The factory director decided to give the operators another opportunity, trying the new arrangement for one week. A month later, the incidents of revision and replacement of defective parts were reduced by 90 percent and for the first time in a long period, projected levels of production were met and established premiums were earned. However, six months later, the factory director decided to return to the old system, due to the enormous pressure he was receiving from other areas of the company.