Advanced Steel Designs
Part: B

0

0

IE code
CO1-265-B-I
Language
English
Format
PDF
Nr. Of Pages
1
Type of publication
Case Study

Instructor support

A Teaching Note is available for this material.

Description

The factory director accepted the operators’ conditions. One month later, incidents for review and replacement of faulty parts had been reduced by 60 percent and production levels had risen by 20 percent, although operators felt that there was still room for improvement. In a further meeting with the director of the factory, they proposed to take care of the defective parts that they could repair themselves.