Advanced Steel Designs Part: B

IE code:
CO1-265-B-I
Language:   English
Format:  
PDF
Nr. Of Pages:
1
Academic Area:
Type of publication:
Case Study

Description

The factory director accepted the operators’ conditions. One month later, incidents for review and replacement of faulty parts had been reduced by 60 percent and production levels had risen by 20 percent, although operators felt that there was still room for improvement. In a further meeting with the director of the factory, they proposed to take care of the defective parts that they could repair themselves.